horizun-msproject-mcp

MCP server · GitHub · ★ 9 · graded 2026-10-24Source linked

MCP server for Microsoft Project: no Java, no Project install. Critical-path engine, DCMA 14-point assessment, verified writes, and a BIM 4D bridge.

No outside reports on file

horizun-msproject-mcp is distributed via GitHub (HorizunGroup/horizun-msproject-mcp); review its source code, dependencies, and requested permissions before use.

Based on public adoption and transparency signals as of Oct 24, 2026. Our opinion, not a code audit or security guarantee.

Was this verdict for Horizun Msproject MCP helpful?

What it can access

  • Local filesNo local folder access notedLOW
  • Command executionNo shell command runner notedLOW
  • Network reachLocal or standard API callsLOW
  • CredentialsNo API token requiredLOW
  • Package sourceGitHub (HorizunGroup/horizun-msproject-mcp)PUBLIC

Inferred from this listing’s public package details and description. Check the project’s source before installing.

Install

No npm or PyPI package is listed. Install from source: github.com/HorizunGroup/horizun-msproject-mcp ↗

All setup options ↓

Everything known

We found nothing about this project in the sources we read (last checked 2026-10-30). That does not mean it has no problems.

0 incidents · 0 advisories · 0 news articles · 0 community threads · checked 2026-10-30

Popularity grade: C (from public signals such as stars and downloads, not a code review). Graded 2026-10-24.

Sources we read: OSV, GitHub Advisory Database, CISA Known Exploited Vulnerabilities, 44 security news feeds and our incident library. Last checked 2026-10-30.

Check a specific version →

About Horizun Msproject MCP

Horizun Msproject MCP is an MCP server focused on Cloud & infrastructure: MCP server for Microsoft Project: no Java, no Project install. Critical-path engine, DCMA 14-point assessment, verified writes, and a BIM 4D bridge.

It is hosted on GitHub at HorizunGroup/horizun-msproject-mcp (9 GitHub stars). Based on its public metadata, it operates with standard local or API scope without broad shell execution flags noted.

Setup

These use the package this listing points to. Check the project’s own instructions before running anything.

No npm or PyPI package is listed for this MCP server. Source code and setup steps: github.com/HorizunGroup/horizun-msproject-mcp.

Why this grade

CC — Moderate risk signals

Signal-based grade (2/7 points): listed in several sources, public source code. This reflects adoption and transparency, not a code review.

Popularity and upkeep

18/100
GitHub stars
9
Listing last refreshed
2026-10-29

These are public popularity signals, not a maintenance check. Look at the repository’s commit history and open issues.

Risks to watch for

  • Dependency & version pinning: Distributed via GitHub (HorizunGroup/horizun-msproject-mcp). Pin an exact release version or commit SHA rather than floating tags so upstream updates are reviewed first.

How to lower the risk

Least-privilege permissions

  • Give it access only to the specific folders, accounts or projects it needs, never your whole drive or admin account.
  • Use a separate, limited API key or login just for this tool so you can switch it off without affecting anything else.

Network isolation

  • Run it on a work computer or sandbox account, not one holding personal or company-sensitive data.
  • If your IT team can, limit which websites and services it is allowed to contact.

Monitoring

  • Check its activity history or logs weekly at first, and look at what it changed or sent.
  • Turn on alerts for new logins or unusual usage on any account it connects to.

Red flags to watch for

  • It asks for more access than its job requires, or prompts you to paste passwords.
  • It suddenly updates with new owners, or starts contacting unfamiliar websites.

Questions

How do I install Horizun Msproject MCP?

Horizun Msproject MCP does not publish a standalone npm or PyPI package. Clone or follow the setup instructions in its source repository at github.com/HorizunGroup/horizun-msproject-mcp.

Are there security reports about Horizun Msproject MCP?

No reports found for this package in our research (last checked 2026-10-30). Horizun Msproject MCP currently holds Grade C (Moderate risk signals) based on public adoption and transparency signals. Review the permissions and source repository before granting access to local files, shell commands, or API keys.

Is Horizun Msproject MCP actively maintained?

Horizun Msproject MCP has 9 GitHub stars. Our directory data was last refreshed on 2026-10-29. Check recent commit activity, release tags, and open issues at github.com/HorizunGroup/horizun-msproject-mcp before pinning it in production.

What are alternatives to Horizun Msproject MCP?

Compare Horizun Msproject MCP side by side with similar MCP servers in the Related tools section on this page, or browse all MCP servers on AgentArmorHQ.

README badge and team notes

Maintain or use Horizun Msproject MCP? Show its live grade in your GitHub README, docs site, or run a check from the terminal before you install.

AgentArmorHQ Risk Grade C for Horizun Msproject MCP

GitHub README Markdown:

markdown
[![AgentArmorHQ Risk Grade for Horizun Msproject MCP](https://agentarmorhq.com/api/badge/horizungroup-horizun-msproject-mcp)](https://agentarmorhq.com/skills/horizungroup-horizun-msproject-mcp)

HTML embed:

html
<a href="https://agentarmorhq.com/skills/horizungroup-horizun-msproject-mcp"><img src="https://agentarmorhq.com/api/badge/horizungroup-horizun-msproject-mcp" alt="AgentArmorHQ Risk Grade for Horizun Msproject MCP" height="20" /></a>

Terminal check:

terminal
curl -fsSL https://agentarmorhq.com/api/cli | node --input-type=module - check "horizungroup-horizun-msproject-mcp"

Share with your security lead

Need sign-off to use horizun-msproject-mcp? Copy this note for Slack, a ticket or a pull request.

### AgentArmorHQ Security Review Memo: horizun-msproject-mcp
- **Listing URL:** https://agentarmorhq.com/skills/horizungroup-horizun-msproject-mcp
- **Type:** App connector
- **Risk Grade:** Grade C (Moderate risk signals)
- **Outside Security Advisories on File:** 0
- **Public Adoption:** 9 GitHub stars

#### Permission & Blast-Radius Signals
- **Local files:** No local folder access noted
- **Command execution:** No shell command runner noted
- **Network reach:** Local or standard API calls
- **Credentials:** No API token required
- **Package source:** GitHub (HorizunGroup/horizun-msproject-mcp)

#### Recommended Hardened Setup
- **Source Repo:** https://github.com/HorizunGroup/horizun-msproject-mcp
- **Controls:** Pin an exact version in `.mcp.json`, scope access to a single workspace folder, and use a least-privilege read-only token where supported.

_Based on public adoption and transparency signals as of Oct 24, 2026. Our opinion, not a code audit or security guarantee._

Key facts

Type
App connector
Publisher
HorizunGroup
Source code
github.com/HorizunGroup/horizun-msproject-mcp
Est. context load
~850 tokens / turn (~5 tool schemas, 0.43% of 200k context)
Popularity
9 GitHub stars
Last updated
2026-10-29
Last graded
2026-10-24

Community

Discussions for Horizun Msproject MCP

Ask questions or share configuration tips. Governed by our Community Rules & Terms.

No posts match this filter yet.

Be the first to ask a question or share a working tip.

Was this listing for Horizun Msproject MCP helpful?

Check before you install, in Claude

Your assistant answers Block, Review or No known issues for any package before it installs it.

Get this check inside Claude